The new compost bin for the Phoenix Garden took shape in the driveway today. A few hours sawing lumber to various lengths this afternoon and an after-dinner build with Howard got the bin ready for install at 9am on Saturday, July 20th. We'll be installing in the orchard of the garden (take Paul Scannell Drive until it ends at the intersection with Loop Rd.)
Here are few shots from the build today:
Pictured above are all of the various lumber pieces (I'll detail the specifics of the build in a later post).
Above are the pieces arranged: bottom are the 2x4's for the dividers, then the 9 foot pieces for the base; middle are the front slats and slat supports; at the top is the structure for the roof.
Putting the hardware cloth on the dividers is definitely a two person job - thanks, Howard!
Here are few shots from the build today:
Pictured above are all of the various lumber pieces (I'll detail the specifics of the build in a later post).
Above are the pieces arranged: bottom are the 2x4's for the dividers, then the 9 foot pieces for the base; middle are the front slats and slat supports; at the top is the structure for the roof.
Comments
Post a Comment